Could not load: Pipe M/C Summary (26-27), Garden Pipe M/C Summary (26-27), Moulding M/C Summary (26-27)
Figures for these plants are absent from this view. Other plants loaded successfully.
FY 2026-27 → totals are summed from the daily production files for Garden Pipe, HDPE, Injection Moulding, Pipe & Fitting, PTMT, Tanks (KH), Tanks (VN), Tanks (WB). No daily workbook exists for Sep 2026, Oct 2026, Nov 2026, Dec 2026, Jan 2027, Feb 2027, Mar 2027 — those months show no data.
61 flag(s) 24/35 files · 104/107 machines · 1/3 months ›

Detected Data Sources

Every workbook the engine reads, mapped to a plant/segment with its grain and the months that currently hold data. All ratios are recomputed from raw hours and output — the stored % cells in the sheets are never trusted.

Spreadsheet updates

When each source workbook's data last changed, as detected by the dashboard. Checked 30-07-2026 04:24.

stale rollup Monthly summary out of date

A published "Compound 6-10" rollup no longer matches its own daily Mixer-Logbook detail — the daily figures are authoritative until the source sheet is corrected.

CPVC F · May 2026 — daily detail is authoritative; the monthly rollup cells are understated and should be corrected in the source sheet.
SWR / AGRI F · May 2026 — daily detail is authoritative; the monthly rollup cells are understated and should be corrected in the source sheet.
No spreadsheet changes detected in the last 7 days.
All workbooks & last-changed times (51)
Workbook Grain Data last changed
Pipe M/C Summary (26-27)
Pipe & Fitting
monthly 25-07-2026 06:23
Pipe & Fitting daily — 2026-06
Pipe & Fitting
daily 25-07-2026 05:25
Tanks (KH) daily — 2026-05
Tanks (KH)
daily 20-07-2026 09:50
Garden Pipe M/C Summary (26-27)
Garden Pipe
monthly 18-07-2026 06:25
Tanks (WB) daily — 2026-06
Tanks (WB)
daily 16-07-2026 09:35
Tanks (WB) daily — 2026-05
Tanks (WB)
daily 16-07-2026 09:35
Tanks (WB) daily — 2026-04
Tanks (WB)
daily 16-07-2026 09:35
Tanks (VN) daily — 2026-06
Tanks (VN)
daily 16-07-2026 09:35
Tanks (VN) daily — 2026-05
Tanks (VN)
daily 16-07-2026 09:35
Tanks (VN) daily — 2026-04
Tanks (VN)
daily 16-07-2026 09:35
Tanks (KH) daily — 2026-06
Tanks (KH)
daily 16-07-2026 09:35
PTMT daily — 2026-06
PTMT
daily 15-07-2026 11:50
Garden Pipe daily — 2026-06
Garden Pipe
daily 13-07-2026 17:20
Moulding M/C Summary (26-27)
Injection Moulding
monthly 06-07-2026 02:47
Pipe & Fitting daily — 2026-05
Pipe & Fitting
daily 02-07-2026 04:49
Pipe & Fitting daily — 2026-04
Pipe & Fitting
daily 30-06-2026 12:46
Garden Pipe daily — 2026-04
Garden Pipe
daily 30-06-2026 07:39
PTMT daily — 2026-05
PTMT
daily 29-06-2026 11:34
PTMT daily — 2026-04
PTMT
daily 29-06-2026 11:34
HDPE daily — 2026-05
HDPE
daily 15-06-2026 11:24
Garden Pipe daily — 2026-05
Garden Pipe
daily 15-06-2026 11:24
HDPE M/C Summary (26-27)
HDPE
monthly 15-06-2026 11:24
Pipe & Fitting daily — 2026-07
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2025-04
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2025-05
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2025-06
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2025-07
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2025-08
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2025-09
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2025-10
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2025-11
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2025-12
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2026-01
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2026-02
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2026-03
Pipe & Fitting
daily Not yet observed
Pipe & Fitting daily — 2026-08
Pipe & Fitting
daily Not yet observed
PTMT daily — 2026-07
PTMT
daily Not yet observed
PTMT daily — 2026-08
PTMT
daily Not yet observed
Garden Pipe daily — 2026-07
Garden Pipe
daily Not yet observed
Garden Pipe daily — 2026-08
Garden Pipe
daily Not yet observed
HDPE daily — 2026-04
HDPE
daily Not yet observed
HDPE daily — 2026-06
HDPE
daily Not yet observed
HDPE daily — 2026-07
HDPE
daily Not yet observed
HDPE daily — 2026-08
HDPE
daily Not yet observed
Tanks (KH) daily — 2026-04
Tanks (KH)
daily Not yet observed
Tanks (KH) daily — 2026-07
Tanks (KH)
daily Not yet observed
Tanks (KH) daily — 2026-08
Tanks (KH)
daily Not yet observed
Tanks (VN) daily — 2026-07
Tanks (VN)
daily Not yet observed
Tanks (VN) daily — 2026-08
Tanks (VN)
daily Not yet observed
Tanks (WB) daily — 2026-07
Tanks (WB)
daily Not yet observed
Tanks (WB) daily — 2026-08
Tanks (WB)
daily Not yet observed
Times are when the dashboard first detected each sheet's current data — not Google's edit time, which this connection can't read.

Workbook Index — tab catalogue

Read from each workbook's own “Index” sheet (the authoritative description of every Report-N tab). Tabs are keyed by description, not number — the same report number means different things across workbooks. Tabs marked available exist in the sheet but the dashboard does not ingest them yet; changed means a tab's description or frequency differs from when it was first seen.

Pipe & Fitting workbook
2026-08
2 ingested · 21 available — not yet built · 36 documented
Report Description Frequency Unit Owner Status
Report-1 FG Stock — Cpvc Pipe & Fittings Every Monday available
Report-1 (A) Upvc Pipe & Fittings Every Monday available
Report-1 (B) Agri Pipe & Fittings Every Monday available
Report-1 (C) Swr Pipe & Fittings Every Monday available
Report-2 RM Item Stock Every Monday & Thursday Mr. Shelendra available
Report-3 BOP Item Stock Every Monday Mr. Anil available
Report-4 Packaging Item Stock Every Monday Mr. Anil available
Report-5 All Types Machine — Pipe M/C
↳ Mixer, Grinder, Pulverizer · Mr. Shelendra
↳ Moulding M/C · Mr. Jitendra
Daily ·sliceable Mr. Ankur ingested
Report-6 Compound — Cpvc Pipe Daily ·sliceable Mr. Shelendra available
Report-7 Upvc Pipe Daily ·sliceable available
Report-8 (A) Agri Pipe Daily ·sliceable available
Report-8 (B) Swr Pipe Daily ·sliceable available
Report-9 Upvc Fittings Daily ·sliceable available
Report-10 Swr Fittings Daily ·sliceable available
Report-11 All Pipe M/C — M/C & Item Wise Actual Production in KG & Pcs Daily ·sliceable kg Mr. Ankur available
Report-11 (A) M/C Breakdown Error — Maintenance Trouble Ticket Daily ·sliceable Report-11 available
Report-12 All Moulding M/C — M/C & Item Wise Actual Production in KG & Pcs Daily ·sliceable kg Mr. Jitendra ingested
Report-13 All Pipe Production — Per day Production in Pcs Cpvc Upvc Swr / Agri Hdpe Daily ·sliceable pcs Report-11 available
Report-14 All Fittings Production — Per day Production in Pcs Cpvc Upvc Swr / Agri Hdpe Daily ·sliceable pcs Mr. Jitendra available
Report-15 Production , Wastage & Pilverizer — Per day Production, Wastage & Pulverizer in Pcs Cpvc Upvc Swr / Agri Daily ·sliceable pcs available
Report-16 M/C Maintenance — M/C Date of Purchase & AMC Applicable Daily ·sliceable available
Report-17, 18, 19 Raw Material, BOP, Packing — April 21-22 Avg. Purchase Price, April ' 22 to till Purchase & Consumption Monthly Ms. Pooja documented
Report-17, 18, 19 (A) > Difference in %age of Purchase Qty & Consumption Monthly Report-17 documented
Report-17, 18, 19 (B) < Difference in %age of Purchase Qty & Consumption Monthly documented
S-20, 21, 22, 23 Summary Report — Mould Working Report Cpvc Upvc Swr Agri Monthly Report-20, 21, 22, 23 documented
Report-20 Mould Working Report — Cpvc Mould Monthly Report-12 available
Report-21 Upvc Mould Monthly available
Report-22 Swr Mould Monthly documented
Report-23 Agri Mould Monthly documented
Report-24 Daily Store Entry — Cpvc Fittings Monthly Mr. Prem Lal documented
Report-25 Upvc Fittings Monthly Mr. Prem Lal documented
Report-26 Swr Fittings Monthly Mr. Prem Lal documented
Report-27 Agri Fittings Monthly Mr. Prem Lal documented
Report-28 Toolroom Working — Machine wise Details with Manpower & Manhour Daily ·sliceable Mr. Ajay Kumar documented
Report-29 Wastage Management — Waste Item, Waste Create in a Week, Responsible Person of Dispose Daily ·sliceable documented
Report-30 Total Manpower & Hours — According to all M/C details Daily ·sliceable HR- Bhw & Kh Mr. Shelendra Mr. Ankur Mr. Jitendra Mr. Vinod Mr. Gaurav Mr. Ajay documented
PTMT workbook
2026-08
1 ingested · 8 available — not yet built · 14 documented
Report Description Frequency Unit Owner Status
Report-1 FG Stock — Cistern, Seat Cover, PTMT Every Monday Mr. Ashish Bisht available
Report-2 BOP, Trading Every Monday Mr. Shyam available
Report-3 Packing Every Monday Mr. Shyam available
Report-4 RM Every Monday Mr. Alok Roy available
Report-5 Moulding M/C — Output & M/C Hours Daily ·sliceable Mr. Alok Roy ingested
Report-6 M/C & Item Wise Actual Production in KG & Pcs Daily ·sliceable kg Mr. Alok Roy documented
Report-7 PTMT / Faucets / Acessories / Other Daily ·sliceable Mr. Alok Roy available
Report-8 Cistern, Seat Cover / Cabinet Daily ·sliceable Mr. Alok Roy available
Report-9 Maintenance — Date of Purchase Monthly Mr. Ramveer available
Report-10 Faucets — Mould Utilisation in Hours Monthly available
Report-11 Accessories & Shower Monthly documented
Report-12 Dept. wise Wastage Management Every Monday documented
Report-13 Table & Packing Table — Person, Item, Production Daily ·sliceable Anuj Sir documented
Report-14 Line-1,2,3 — Person, Item, Plan & Actual Daily ·sliceable Anuj Sir documented
HDPE M/C Summary (26-27)
HDPE · HDPE
monthly
Data sheet used
HDPE M/C 26-27
Months with data
1 month(s)
Records parsed
1
2026-05
Machine / detail tabs (6)
M/C-1 M/C-2 M/C-3 M/C-4 M/C-5 M/C-6
Reconciled to grid TOTAL (1370.0 vs 1370.0)
Header → field mapping
Sheet header Maps to
Ideal Hours ideal_hours
carried forward across month rows
Actual Hours actual_hours
run time
Actual Output (KG) / Output (KG) / Output (PCS) total_count
raw produced quantity
Ideal Output ideal_rate
ideal kg/hr → ideal_output = actual_hrs × rate
Rejection (KG) / Rejection reject_count
% reject recomputed, never read
Runner runner_lumps
moulding layout only
Month label column period
e.g. APR'26 → 2026-04
Machine / Mould Machine machine
carried forward; merged label cell
Stored % cells (Utilisation %, Output Efficiency %) are ignored — every ratio is recomputed from raw hours and output.
file: 1TRpfk3UzsAow4InJ6HyT_smayOdHfyoZ67xmHIwD2tw
Pipe & Fitting — daily workbooks
Pipe & Fitting · Pipe
daily
Data sheet used
Report-5/Report-12
Months with data
17 month(s)
Records parsed
0
Daily grain; ideal rate/hours joined from the monthly grid baseline. Emits: PIPE, MOULDING. Layout: long/matrix.
2025-04 2025-05 2025-06 2025-07 2025-08 2025-09 2025-10 2025-11 2025-12 2026-01 2026-02 2026-03 2026-04 2026-05 2026-06 2026-07 2026-08
Header → field mapping
Sheet header Maps to
Ideal Hours ideal_hours
carried forward across month rows
Actual Hours actual_hours
run time
Actual Output (KG) / Output (KG) / Output (PCS) total_count
raw produced quantity
Ideal Output ideal_rate
ideal kg/hr → ideal_output = actual_hrs × rate
Rejection (KG) / Rejection reject_count
% reject recomputed, never read
Runner runner_lumps
moulding layout only
Month label column period
e.g. APR'26 → 2026-04
Machine / Mould Machine machine
carried forward; merged label cell
Stored % cells (Utilisation %, Output Efficiency %) are ignored — every ratio is recomputed from raw hours and output.
file: 1eNUSktOldFHRtM55VYfLiYp5nLDRk3ovOEdYYKfI0hU
PTMT — daily workbooks
PTMT · Ptmt
daily
Data sheet used
Report-5
Months with data
5 month(s)
Records parsed
0
Daily tab carries an in-sheet ideal column; utilisation uses it directly. Layout: matrix.
2026-04 2026-05 2026-06 2026-07 2026-08
Header → field mapping
Sheet header Maps to
Ideal Hours ideal_hours
carried forward across month rows
Actual Hours actual_hours
run time
Actual Output (KG) / Output (KG) / Output (PCS) total_count
raw produced quantity
Ideal Output ideal_rate
ideal kg/hr → ideal_output = actual_hrs × rate
Rejection (KG) / Rejection reject_count
% reject recomputed, never read
Runner runner_lumps
moulding layout only
Month label column period
e.g. APR'26 → 2026-04
Machine / Mould Machine machine
carried forward; merged label cell
Stored % cells (Utilisation %, Output Efficiency %) are ignored — every ratio is recomputed from raw hours and output.
file: 16zsh5x4MdY8DX3H5_hw5iaOdkGixlUsPzesDVnwgfYo
Garden Pipe — daily workbooks
Garden Pipe · Garden Pipe
daily
Data sheet used
^MACHINE\s*\d+$
Months with data
5 month(s)
Records parsed
0
Daily grain; ideal rate/hours joined from the monthly grid baseline. Layout: blocks.
2026-04 2026-05 2026-06 2026-07 2026-08
Header → field mapping
Sheet header Maps to
Ideal Hours ideal_hours
carried forward across month rows
Actual Hours actual_hours
run time
Actual Output (KG) / Output (KG) / Output (PCS) total_count
raw produced quantity
Ideal Output ideal_rate
ideal kg/hr → ideal_output = actual_hrs × rate
Rejection (KG) / Rejection reject_count
% reject recomputed, never read
Runner runner_lumps
moulding layout only
Month label column period
e.g. APR'26 → 2026-04
Machine / Mould Machine machine
carried forward; merged label cell
Stored % cells (Utilisation %, Output Efficiency %) are ignored — every ratio is recomputed from raw hours and output.
file: 1mbxHLgvvruhI-3_d9zoqevZQxHhjxZY4cN0tIyxkzEo
HDPE — daily workbooks
HDPE · HDPE
daily
Data sheet used
Daily Report
Months with data
5 month(s)
Records parsed
0
Daily grain; ideal rate/hours joined from the monthly grid baseline. Layout: matrix.
2026-04 2026-05 2026-06 2026-07 2026-08
Header → field mapping
Sheet header Maps to
Ideal Hours ideal_hours
carried forward across month rows
Actual Hours actual_hours
run time
Actual Output (KG) / Output (KG) / Output (PCS) total_count
raw produced quantity
Ideal Output ideal_rate
ideal kg/hr → ideal_output = actual_hrs × rate
Rejection (KG) / Rejection reject_count
% reject recomputed, never read
Runner runner_lumps
moulding layout only
Month label column period
e.g. APR'26 → 2026-04
Machine / Mould Machine machine
carried forward; merged label cell
Stored % cells (Utilisation %, Output Efficiency %) are ignored — every ratio is recomputed from raw hours and output.
file: 1TTxcpSQyVyleermiOhYlxlcd3RE0Pay0dRHLnXSEohs
Tanks (KH) — daily workbooks
Tanks (KH) · Tank
daily
Data sheet used
PROD. REPORT
Months with data
5 month(s)
Records parsed
0
Daily grain; no monthly grid or in-sheet ideal — hours & output are shown and the plant is flagged 'no baseline set'. Layout: tank.
2026-04 2026-05 2026-06 2026-07 2026-08
Header → field mapping
Sheet header Maps to
Ideal Hours ideal_hours
carried forward across month rows
Actual Hours actual_hours
run time
Actual Output (KG) / Output (KG) / Output (PCS) total_count
raw produced quantity
Ideal Output ideal_rate
ideal kg/hr → ideal_output = actual_hrs × rate
Rejection (KG) / Rejection reject_count
% reject recomputed, never read
Runner runner_lumps
moulding layout only
Month label column period
e.g. APR'26 → 2026-04
Machine / Mould Machine machine
carried forward; merged label cell
Stored % cells (Utilisation %, Output Efficiency %) are ignored — every ratio is recomputed from raw hours and output.
file: 1osCJ1ZF2okCdHXbhkBthvJ7T7x21warW1-NMGm-5xbc
Tanks (VN) — daily workbooks
Tanks (VN) · Tank_Vn
daily
Data sheet used
PROD. REPORT
Months with data
5 month(s)
Records parsed
0
Daily grain; no monthly grid or in-sheet ideal — hours & output are shown and the plant is flagged 'no baseline set'. Layout: tank.
2026-04 2026-05 2026-06 2026-07 2026-08
Header → field mapping
Sheet header Maps to
Ideal Hours ideal_hours
carried forward across month rows
Actual Hours actual_hours
run time
Actual Output (KG) / Output (KG) / Output (PCS) total_count
raw produced quantity
Ideal Output ideal_rate
ideal kg/hr → ideal_output = actual_hrs × rate
Rejection (KG) / Rejection reject_count
% reject recomputed, never read
Runner runner_lumps
moulding layout only
Month label column period
e.g. APR'26 → 2026-04
Machine / Mould Machine machine
carried forward; merged label cell
Stored % cells (Utilisation %, Output Efficiency %) are ignored — every ratio is recomputed from raw hours and output.
file: 1Vsba-WDcYwSstEZsX37ntm_N05yPn0T5DzSkls9zRUw
Tanks (WB) — daily workbooks
Tanks (WB) · Tank_Wb
daily
Data sheet used
PROD. REPORT
Months with data
5 month(s)
Records parsed
0
Daily grain; no monthly grid or in-sheet ideal — hours & output are shown and the plant is flagged 'no baseline set'. Layout: tank.
2026-04 2026-05 2026-06 2026-07 2026-08
Header → field mapping
Sheet header Maps to
Ideal Hours ideal_hours
carried forward across month rows
Actual Hours actual_hours
run time
Actual Output (KG) / Output (KG) / Output (PCS) total_count
raw produced quantity
Ideal Output ideal_rate
ideal kg/hr → ideal_output = actual_hrs × rate
Rejection (KG) / Rejection reject_count
% reject recomputed, never read
Runner runner_lumps
moulding layout only
Month label column period
e.g. APR'26 → 2026-04
Machine / Mould Machine machine
carried forward; merged label cell
Stored % cells (Utilisation %, Output Efficiency %) are ignored — every ratio is recomputed from raw hours and output.
file: 1-JVeDFTnFfoMjDMhvkOV5BE1rKjjO00chRKtUpO5iqQ
Daily-grain workbooks register here once their file IDs are added to the source registry.

Planning, Material & Maintenance tabs

On-demand domains — read from the same workbooks as daily data (no extra Drive sharing). Phase 2A: Demand planning (Report-1). Phase 2B: Material/BOP/packaging stock readiness (Report-2/3/4). Phase 2C: Maintenance master (Report-16/8) + Manpower roster (Report-22/6). None of these are loaded on the / dashboard.

PIPE
Report-1 — demand (CPVC) Report-1 (A) — demand (UPVC) Report-1 (B) — demand (AGRI) Report-1 (C) — demand (SWR) Report-2 — RM stock Report-3 — BOP stock Report-4 — PACK stock Report-16 — maintenance master Report-22 (A) — manpower (shift all) Report-22 (B) — manpower (shift all)
PTMT
Report-1 — demand (faucet) Report-1(A) — demand (cistern) Report-1(B) — demand (seatcover) Report-2 — BOP stock Report-3 — PACK stock Report-4 — RM stock Report-8 — maintenance master Report-6 (A) — manpower (shift 1st) Report-6 (B) — manpower (shift 2nd) Report-6 (C) — manpower (shift 3rd)

Derived Views (Phase 3)

/plan →

/plan — unified per-machine planning board. Joins Phase 2A–2C on-demand loaders (planning, materials, maintenance, manpower) with existing production/metrics. No new sheet reads — reuses cached data only. Never loaded on /. Feed & Tooling gates show grey until Phase 2D lands.