📊 Combined Cost Summary — FY2026-27
Labour Cost
₹5,522,131
₹6.12/kg
Pipe Production
637,410 kg
Fittings Production
340,495 kg
Total Production
901,953 kg
₹/kg basis
⚠ Partial (no labour yet)
75,952 kg
excluded from ₹/kg
👷 Labour Costing 🧪 Raw Material Costing
⚠️ Labour cost runs 66.7% above ideal — actual ₹6.122/kg vs ideal ₹3.673/kg. Investigate overtime, contractor mix, or low production output.
⚖️ Actual vs Ideal Labour Cost
Actual ₹/kg
₹6.122
Ideal ₹/kg (weighted)
₹3.673
Pipe ₹2.50 · Fittings ₹6.50
Variance ₹/kg
+2.449
Variance %
+66.7%
Total Wages
₹5,522,131
Total Production
901,953 kg
Pipe 637,410 · Fit 264,543
🔩 Pipe Machine Labour — Attribution Note
Report-22 (machine manpower allocation) has been verified across multiple monthly workbooks for this segment. All 9 pipe extrusion machines record zero man-hours — pipe machine labour is not captured at the machine level anywhere in the source. Every recorded man-hour belongs to moulding machines and moulding support departments.
Derived Pipe Labour (not measured)
₹1,593,525
Ideal rate ₹2.50/kg × 637,410 kg
Pipe Machines (9)
Not captured
Report-22 rows are empty across all verified months
Moulding Machines
Per-machine (from Report-22)
Requires monthly workbook read (separate step)
ℹ️ Moulding labour in Report-22 is allocated per machine, not per mould or fitting item, so it cannot be attributed to a specific fitting type (CPVC/UPVC/SWR/AGRI) without a further allocation model. The derived pipe figure above uses the ideal rate only and is shown for reference — do not use it as a measured cost.
📋 FY Totals — FY2026-27
Payroll Labour
317
Contractor Labour
109
Paid Hours
93,443
Actual Hours
82,415
Paid Wages
₹5,522,131
₹/hr (paid hrs)
₹59.10
₹/hr (actual hrs)
₹67.00
Pipe Production
637,410 kg
Fittings Prod.
340,495 kg
Total Production
977,905 kg
incl. 75,952 kg partial
📅 Monthly Labour Detail
⚠️ Data Quality — "Wt in Kgs" diverges from formula "Weight of Total Production" by >2%
Affected months: APR 5.0% · MAY 5.1% · JUN 4.4% · JUL 5.6%. Costing uses gross actual (Wt in Kgs + Rejection Weight) — this flag signals possible hand-entry errors in the Moulding Report-12 weight column. Correct at source to clear the warning.
APR: 79 row(s) with >5% per-row divergence — e.g. 33000778 (15.3% off)
MAY: 77 row(s) with >5% per-row divergence — e.g. U73 (59.6% off)
JUN: 80 row(s) with >5% per-row divergence — e.g. C71 (84.3% off)
JUL: 76 row(s) with >5% per-row divergence — e.g. C521 (38.8% off)
Month Payroll Contractor Paid Hrs Actual Hrs Paid Wages ₹ ₹/hr (paid) ₹/hr (actual) Pipe kg LS Fittings kg R-12 Total kg ₹/kg
APR 100 18 29,904 26,640 ₹1,817,263 60.77 68.22 170,063 90,038 R12 ⚠5.0% 260,101 6.987
MAY 104 26 30,068 26,134 ₹1,709,543 56.86 65.42 344,000 76,523 R12 ⚠5.1% 420,523 4.065
JUN 113 65 33,472 29,642 ₹1,995,325 59.61 67.31 123,347 97,981 R12 ⚠4.4% 221,328 9.015
JUL ₹— 75,952 R12 ⚠5.6% 75,952
AUG ₹— LS
SEP ₹— LS
OCT ₹— LS
NOV ₹— LS
DEC ₹— LS
JAN ₹— LS
FEB ₹— LS
MAR ₹— LS
TOTAL 93,443 82,415 ₹5,522,131 59.10 67.00 637,410 340,495 977,905 5.647