Showing each plant's latest reporting day — Injection Moulding 28-07-2026, PTMT 28-07-2026, Pipe & Fitting 27-07-2026, Tanks (WB) 24-07-2026, Tanks (KH) 23-07-2026, Tanks (VN) 22-07-2026, Garden Pipe 01-07-2026, HDPE 01-05-2026. A plant with no recent daily data isn't shown.
57 flag(s) 19/21 files · 82/94 machines · 3/3 months ›
Live production sheets
Refresh data
Output Efficiency
55.2%
Monthly data — OEE (availability × performance × quality) needs daily shift logs
RED
Utilisation 62.6%
Output Efficiency 55.2%
Total Output
36,654 kg
143,000 Ltr
by unit
Plan Attainment
0.0%
vs plan
Rejection %
7.1% kg
0.0% Ltr
by unit
Downtime
0
minutes
Management Commentary AI-generated from computed data

Overall operational performance is showing significant strain, with Output Efficiency at 55.2% and Utilisation at 62.6%, indicating that a substantial portion of available capacity and productive potential is going unrealised. Most critically, the Rejection Rate of 79.84% is exceptionally high and demands immediate attention, as nearly four in every five units produced are failing quality checks, severely undermining the value of Total Output recorded at 179,654 units. Addressing the root causes of the rejection rate should be the priority focus, as resolving this issue would have the most immediate and material impact on overall plant performance.

Output Efficiency % — Monthly Trend

vs 85% target

Plant Summary

Last updated