Could not load:
Pipe M/C Summary (26-27), Garden Pipe M/C Summary (26-27), Moulding M/C Summary (26-27)
Figures for these plants are absent from this view. Other plants loaded successfully.
June 2026 → totals are summed from the daily production files for Garden Pipe, Injection Moulding, Pipe & Fitting, PTMT, Tanks (KH), Tanks (VN), Tanks (WB).
16 flag(s)
6/7 files · 101/106 machines · 1/3 months ›
Live production sheets
Refresh data
Output Efficiency
61.6%
Monthly data — OEE (availability × performance × quality) needs daily shift logs
AMBER
Utilisation
76.8%
Output Efficiency
61.6%
Total Output
493,099 kg
3,383,000 Ltr
by unit
Plan Attainment
0.0%
vs plan
Rejection %
5.3% kg
0.0% Ltr
by unit
Downtime
0
minutes
Management Commentary
AI-generated from computed data
June 2026 total output reached 3,876,099 units against a utilisation rate of 76.8%, indicating the plant kept its equipment reasonably busy through the period. However, the standout concern is a rejection rate of 33.49%, which is directly dragging output efficiency down to 61.6% and means roughly one in three units produced is not meeting standard. Priority attention should focus on identifying the root causes of this rejection level, as reducing scrap would deliver the fastest improvement to overall efficiency without requiring additional machine time.
Output Efficiency % — Monthly Trend
vs 85% targetPlant Summary
Garden Pipe (GARDEN)
66.9%
Utilisation
Injection Moulding (MOULDING)
78.5%
Utilisation
Pipe & Fitting (PIPE)
61.6%
Output Efficiency
PTMT (PTMT)
76.6%
Utilisation
Tanks (KH) (TANK)
1,419,500 Ltr
Output · Run hours not recorded
Tanks (VN) (TANK_VN)
533,500 Ltr
Output · No baseline set
Tanks (WB) (TANK_WB)
1,430,000 Ltr
Output · No baseline set
June 2026