Labour: loaded 12 months
· 24-07-2026 14:36
📊 Combined Cost Summary — FY2025-26
Labour Cost
₹21,452,790
₹4.16/kg
Pipe Production
4,184,706 kg
Fittings Production
975,609 kg
Total Production
5,160,315 kg
₹/kg basis
🔒 Frozen snapshot — read-only.
⚠️ Labour cost runs 27.7% above ideal
— actual ₹4.157/kg vs ideal
₹3.256/kg.
Investigate overtime, contractor mix, or low production output.
⚖️ Actual vs Ideal Labour Cost
Actual ₹/kg
₹4.157
Ideal ₹/kg (weighted)
₹3.256
Pipe ₹2.50 · Fittings ₹6.50
Variance ₹/kg
+0.901
Variance %
+27.7%
Total Wages
₹21,452,790
Total Production
5,160,315 kg
Pipe 4,184,706 · Fit 975,609
🔩 Pipe Machine Labour — Attribution Note
Report-22 (machine manpower allocation) has been verified across multiple
monthly workbooks for this segment.
All 9 pipe extrusion machines record zero man-hours —
pipe machine labour is not captured at the machine level anywhere in the
source. Every recorded man-hour belongs to moulding machines and
moulding support departments.
Derived Pipe Labour (not measured)
₹10,461,765
Ideal rate ₹2.50/kg × 4,184,706 kg
Pipe Machines (9)
Not captured
Report-22 rows are empty across all verified months
Moulding Machines
Per-machine (from Report-22)
Requires monthly workbook read (separate step)
ℹ️ Moulding labour in Report-22 is allocated per machine, not per mould or
fitting item, so it cannot be attributed to a specific fitting type (CPVC/UPVC/SWR/AGRI)
without a further allocation model.
The derived pipe figure above uses the ideal rate only and is shown for
reference — do not use it as a measured cost.
📋 FY Totals — FY2025-26
Payroll Labour
1438
Paid Hours
431,468
Actual Hours
362,225
Paid Wages
₹21,452,790
₹/hr (paid hrs)
₹49.72
₹/hr (actual hrs)
₹59.23
Pipe Production
4,184,706 kg
Fittings Prod.
975,609 kg
Total Production
5,160,315 kg
📅 Monthly Labour Detail
| Month | Payroll | Paid Hrs | Actual Hrs | Paid Wages ₹ | ₹/hr (paid) | ₹/hr (actual) | Pipe kg LS | Fittings kg R-12 | Total kg | ₹/kg |
|---|---|---|---|---|---|---|---|---|---|---|
| APR | 122 | 38,849 | 34,143 | ₹1,904,701 | 49.03 | 55.79 | 430,621 | 85,371 R12 | 515,992 | 3.691 |
| MAY | 135 | 37,237 | 32,748 | ₹1,773,715 | 47.63 | 54.16 | 344,393 | 84,233 R12 | 428,626 | 4.138 |
| JUN | 124 | 36,978 | 31,404 | ₹1,829,548 | 49.48 | 58.26 | 456,214 | 86,661 R12 | 542,875 | 3.370 |
| JUL | 129 | 40,724 | 35,452 | ₹1,952,003 | 47.93 | 55.06 | 475,780 | 98,317 R12 | 574,097 | 3.400 |
| AUG | 125 | 39,686 | 30,740 | ₹1,944,241 | 48.99 | 63.25 | — | 76,363 R12 | 76,363 | 25.461 |
| SEP | 123 | 38,399 | 33,143 | ₹1,923,477 | 50.09 | 58.04 | 360,137 | 90,889 R12 | 451,026 | 4.265 |
| OCT | 122 | 36,972 | 27,302 | ₹1,764,710 | 47.73 | 64.64 | 261,136 | 59,970 R12 | 321,106 | 5.496 |
| NOV | 114 | 30,764 | 25,308 | ₹1,561,635 | 50.76 | 61.71 | 257,117 | 67,190 R12 | 324,307 | 4.815 |
| DEC | 114 | 33,068 | 28,632 | ₹1,632,389 | 49.36 | 57.01 | 373,032 | 77,477 R12 | 450,509 | 3.623 |
| JAN | 120 | 36,602 | 30,780 | ₹1,792,219 | 48.97 | 58.23 | 426,893 | 90,140 R12 | 517,033 | 3.466 |
| FEB | 106 | 32,356 | 27,552 | ₹1,844,723 | 57.01 | 66.95 | 451,856 | 87,914 R12 | 539,770 | 3.418 |
| MAR | 104 | 29,834 | 25,022 | ₹1,529,429 | 51.27 | 61.12 | 347,527 | 71,086 R12 | 418,613 | 3.654 |
| TOTAL | — | 431,468 | 362,225 | ₹21,452,790 | 49.72 | 59.23 | 4,184,706 | 975,609 | 5,160,315 | 4.157 |