Prayag Production
Costing Analysis
← Home
Category Plumbing PTMT
FY FY2026-27 FY2025-26 FY2023-24 FY2022-23
Contractor
⚠ Warnings & Alerts
AUG: Power spike — +184% above ideal
Rs 16.66/kg actual vs Rs 5.87/kg ideal (low production volume 76,363 kg in this month).
→ Review production calendar — spreading fixed power charges over thin volume.
Labour Rs/kg +28% above ideal
Actual Rs 4.16/kg vs ideal Rs 3.26/kg.
→ Review headcount vs production volume; consider contractor rationalisation.
Paid hours exceed actual by 16.0%
Paid: 431,468 h | Actual: 362,225 h | Gap: 69,243 h
→ Audit attendance records; review shift scheduling efficiency.
Ideal rates advisory
Pipe labour ideal=Rs 2.50/kg, Fitting=Rs 6.50/kg, Pipe power=Rs 4.00/kg, Fitting power=Rs 8.00/kg. Verify these reflect current capacity norms.
→ Review with engineering if capacity/staffing norms have changed since baseline.
12-month snapshot · FY2025-26 (incl contractor)
Labour Actual
Rs 4.16/kg
Plumbing denom · 5,160,315 kg
Labour Ideal
Rs 3.26/kg
Pipe × Rs 2.50 + Fit × Rs 6.50
Labour Δ vs Ideal
+28%
Rs +0.90/kg over ideal
Power Actual
Rs 5.26/kg
All-plant denom
Power Ideal
Rs 4.49/kg
Pipe × Rs 4.00 + Fit × Rs 8.00
Combined Δ vs Ideal
+22%
Rs 9.42 vs Rs 7.75 ideal
⚠ Combined = Labour (Plumbing denominator) + Power (all-plant denominator). These use different production bases and cannot be directly summed to a single-denominator figure.
Monthly Cost Stack
MonthProd (kg) Labour Act.Labour IdealLab Δ% Power Act.Power IdealPwr Δ% Combined
APR 515,992 Rs 3.69 Rs 3.16 +17% Rs 4.24 Rs 4.28 -1% Rs 7.93
MAY 428,626 Rs 4.14 Rs 3.29 +26% Rs 4.97 Rs 4.43 +12% Rs 9.11
JUN 542,875 Rs 3.37 Rs 3.14 +7% Rs 4.35 Rs 4.38 -1% Rs 7.72
JUL 574,097 Rs 3.40 Rs 3.19 +7% Rs 4.84 Rs 4.44 +9% Rs 8.24
AUG 76,363 Rs 25.46 Rs 6.50 +292% Rs 16.66 Rs 5.87 +184% Rs 42.12
SEP 451,026 Rs 4.26 Rs 3.31 +29% Rs 5.50 Rs 4.66 +18% Rs 9.76
OCT 321,106 Rs 5.50 Rs 3.25 +69% Rs 6.45 Rs 4.63 +39% Rs 11.95
NOV 324,307 Rs 4.82 Rs 3.33 +45% Rs 6.25 Rs 4.65 +34% Rs 11.07
DEC 450,509 Rs 3.62 Rs 3.19 +14% Rs 5.68 Rs 4.49 +26% Rs 9.30
JAN 517,033 Rs 3.47 Rs 3.20 +8% Rs 5.24 Rs 4.50 +16% Rs 8.71
FEB 539,770 Rs 3.42 Rs 3.15 +8% Rs 4.45 Rs 4.41 +1% Rs 7.87
MAR 418,613 Rs 3.65 Rs 3.18 +15% Rs 4.24 Rs 4.34 -2% Rs 7.89
FY Total 5,160,315 Rs 4.16 Rs 3.26 +28% Rs 5.26 Rs 4.49 +17% Rs 9.42
Labour denom = Plumbing (pipe + fitting). Power denom = all plants (Plumbing + Garden + HDPE + Tank). Source: UNIT-2 tab + Ideal Power Cost tab, FY2025-26 workbook.
Labour Detail
Paid Wages (KH-1)
Rs 21,452,790
Excl contractor
Total Wages (incl contractor)
Rs 21,452,790
Labour Excl Contractor
Rs 4.16/kg
Pipe Production
4,184,706 kg
Fitting Production
975,609 kg
Paid vs Actual Hours
16.0% of paid hours not worked — 69,243 hrs gap (paid 431,468 vs actual 362,225)
MonthPaid HrsActual HrsGap (hrs)Gap %
APR 38,849 34,143 4,706 12.1%
MAY 37,237 32,748 4,489 12.1%
JUN 36,978 31,404 5,574 15.1%
JUL 40,724 35,452 5,272 12.9%
AUG 39,686 30,740 8,946 22.5%
SEP 38,399 33,143 5,256 13.7%
OCT 36,972 27,302 9,670 26.2%
NOV 30,764 25,308 5,456 17.7%
DEC 33,068 28,632 4,436 13.4%
JAN 36,602 30,780 5,822 15.9%
FEB 32,356 27,552 4,804 14.8%
MAR 29,834 25,022 4,812 16.1%
Power Deep-Dive (UNIT-2)
UNIT-2 tab · per-kg power uses Plumbing denominator. "All-plant" column from Ideal Power Cost tab uses all-plants denominator.
Month JVVL (Rs) kWh cons. Rs/kWh Solar (kWh) kWh/kg Power/kg (7.08) Power/kg (11.5) Power/kg (all-plant) Ideal/kg (all-plant)
APR 2,644,601 383,490 Rs 8.29 64,440 0.71 Rs 5.75 Rs 4.24 Rs 4.28
MAY 2,408,798 334,350 Rs 8.72 58,140 0.76 Rs 6.37 Rs 4.97 Rs 4.43
JUN 2,654,171 389,085 Rs 7.71 44,700 0.69 Rs 5.27 Rs 4.35 Rs 4.38
JUL 3,110,931 424,580 Rs 8.30 49,820 0.70 Rs 5.73 Rs 4.84 Rs 4.44
AUG 2,181,143 295,230 Rs 8.77 46,560 3.12 Rs 26.56 Rs 16.66 Rs 5.87
SEP 2,424,393 331,075 Rs 8.67 51,400 0.71 Rs 6.01 Rs 5.50 Rs 4.66
OCT 2,016,741 262,055 Rs 9.22 43,400 0.78 Rs 6.96 Rs 6.45 Rs 4.63
NOV 2,028,436 254,800 Rs 9.41 39,340 0.77 Rs 6.94 Rs 6.25 Rs 4.65
DEC 2,684,350 342,330 Rs 8.79 36,960 0.75 Rs 6.46 Rs 5.68 Rs 4.49
JAN 2,859,817 358,295 Rs 8.73 30,560 0.69 Rs 5.93 Rs 5.24 Rs 4.50
FEB 2,582,765 321,990 Rs 8.95 33,360 0.60 Rs 5.22 Rs 4.45 Rs 4.41
MAR 1,883,957 255,390 Rs 9.09 48,120 0.61 Rs 5.31 Rs 4.24 Rs 4.34
FY Total 29,480,103 3,952,670 Rs 33,351,448 Rs 5.26 Rs 4.49
Ideal total power (all plants): Rs 28,473,585 · Actual: Rs 33,351,448
Month-over-Month Trends
MonthLabour Act. Rs/kgMoM ΔPower Act. Rs/kgMoM ΔCombined Rs/kgMoM Δ
APR 3.69 4.24 7.93
MAY 4.14 +12.1% 4.97 +17.2% 9.11 +14.8%
JUN 3.37 -18.6% 4.35 -12.5% 7.72 -15.2%
JUL 3.40 +0.9% 4.84 +11.3% 8.24 +6.7%
AUG 25.46 +648.8% 16.66 +244.2% 42.12 +411.2%
SEP 4.26 -83.2% 5.50 -67.0% 9.76 -76.8%
OCT 5.50 +28.9% 6.45 +17.3% 11.95 +22.3%
NOV 4.82 -12.4% 6.25 -3.1% 11.07 -7.4%
DEC 3.62 -24.8% 5.68 -9.1% 9.30 -15.9%
JAN 3.47 -4.3% 5.24 -7.7% 8.71 -6.4%
FEB 3.42 -1.4% 4.45 -15.1% 7.87 -9.6%
MAR 3.65 +6.9% 4.24 -4.7% 7.89 +0.3%
Year-over-Year vs FY2023-24
MonthMetricFY2025-26FY2023-24YoY Δ%
APR Labour Rs/kg (actual) 3.69 8.87 -58.4%
APR Labour Rs/kg (ideal) 3.16 3.32 -4.6%
APR Power Rs/kg (actual) 4.24
APR Combined Rs/kg 7.93
MAY Labour Rs/kg (actual) 4.14 7.33 -43.6%
MAY Labour Rs/kg (ideal) 3.29 3.27 +0.5%
MAY Power Rs/kg (actual) 4.97
MAY Combined Rs/kg 9.11
JUN Labour Rs/kg (actual) 3.37 9.04 -62.7%
JUN Labour Rs/kg (ideal) 3.14 3.39 -7.6%
JUN Power Rs/kg (actual) 4.35
JUN Combined Rs/kg 7.72
JUL Labour Rs/kg (actual) 3.40 9.36 -63.7%
JUL Labour Rs/kg (ideal) 3.19 3.47 -8.3%
JUL Power Rs/kg (actual) 4.84
JUL Combined Rs/kg 8.24
AUG Labour Rs/kg (actual) 25.46 6.51 +290.8%
AUG Labour Rs/kg (ideal) 6.50 3.23 +101.1%
AUG Power Rs/kg (actual) 16.66
AUG Combined Rs/kg 42.12
SEP Labour Rs/kg (actual) 4.26 6.94 -38.5%
SEP Labour Rs/kg (ideal) 3.31 3.30 +0.3%
SEP Power Rs/kg (actual) 5.50
SEP Combined Rs/kg 9.76
OCT Labour Rs/kg (actual) 5.50 10.21 -46.2%
OCT Labour Rs/kg (ideal) 3.25 3.20 +1.5%
OCT Power Rs/kg (actual) 6.45
OCT Combined Rs/kg 11.95
NOV Labour Rs/kg (actual) 4.82 6.65 -27.5%
NOV Labour Rs/kg (ideal) 3.33 3.10 +7.3%
NOV Power Rs/kg (actual) 6.25
NOV Combined Rs/kg 11.07
DEC Labour Rs/kg (actual) 3.62 6.75 -46.3%
DEC Labour Rs/kg (ideal) 3.19 3.17 +0.7%
DEC Power Rs/kg (actual) 5.68
DEC Combined Rs/kg 9.30
JAN Labour Rs/kg (actual) 3.47 7.06 -50.9%
JAN Labour Rs/kg (ideal) 3.20 3.08 +3.7%
JAN Power Rs/kg (actual) 5.24
JAN Combined Rs/kg 8.71
FEB Labour Rs/kg (actual) 3.42 8.77 -61.0%
FEB Labour Rs/kg (ideal) 3.15 3.54 -10.9%
FEB Power Rs/kg (actual) 4.45
FEB Combined Rs/kg 7.87
MAR Labour Rs/kg (actual) 3.65 6.34 -42.4%
MAR Labour Rs/kg (ideal) 3.18 3.26 -2.6%
MAR Power Rs/kg (actual) 4.24
MAR Combined Rs/kg 7.89
Cost Bridge — FY2023-24 → FY2025-26
Decomposition of change in Labour Rs/kg.
Rate = wage-rate change holding volume constant.
Volume = volume change holding wages constant.
Mix = structural shift in product mix (ideal Rs/kg change).
FY2023-24
Rs 7.63/kg · 4,223,283 kg
FY2025-26
Rs 4.16/kg · 5,160,315 kg
Rate effect
-2.09 Rs/kg
Volume effect
-1.39 Rs/kg
Mix effect
-0.01 Rs/kg
Total Δ
-3.48 Rs/kg
Volume Sensitivity (Labour + Power)
Based on 12-month actuals (5,160,315 kg). Labour modelled 90% fixed / 10% variable. Power modelled 35% fixed (demand charges) / 65% variable.
ScenarioVolume (kg)Labour Rs/kgPower Rs/kgCombined Rs/kg
Current 5,160,315 4.16 6.46 10.62
+10% 5,676,347 3.82 6.39 10.21
+20% 6,192,379 3.53 6.34 9.87
+30% 6,708,410 3.29 6.29 9.58
Sensitivity model assumes wages and JVVL demand charges are largely fixed in the short term. For production increases beyond current infrastructure, incremental capex costs are not captured here.
Data Sources & Methodology

Labour wages — KH-1 monthly wage files (department CPVC), authoritative for regular payroll. Contractor wages from UNIT-2 tab ("Paid Wages for Contractor Labour") — not separately verified against KH-1.

Fittings production (kg) — Report-12 (Wt in Kgs + Rejection), not the labour sheet which carries piece counts (mislabelled FY2026-27).

Ideal rates — Pipe Labour Rs 2.50/kg, Fitting Labour Rs 6.50/kg (from Ideal Labour Cost TOTAL row); Pipe Power Rs 4.00/kg, Fitting Power Rs 8.00/kg (from Ideal Power Cost TOTAL row). Verify with engineering if capacity norms have changed.

Power actuals — UNIT-2 tab of the annual workbook; per-kg cost uses Plumbing-only denominator. The "All-plant" per-kg (from Ideal Power Cost tab) uses Plumbing + Garden Pipe + HDPE + Tank denominator — the JVVL bill is a shared facility cost spread by volume.

Cost bridge — Labour only; uses 2-factor decomposition (Rate + Volume + Mix). Power bridge deferred pending prior-FY power tab loading.

Volume sensitivity — simplified model; actual Rs/kg at higher volumes depends on whether additional labour is required.