FY 2026-27 → totals are summed from the daily production files for Garden Pipe, HDPE, Injection Moulding, Pipe & Fitting, PTMT, Tanks. No daily workbook exists for Jul 2026, Aug 2026, Sep 2026, Oct 2026, Nov 2026, Dec 2026, Jan 2027, Feb 2027, Mar 2027 — those months show no data.
47 flag(s) 11/15 files · 87/91 machines · 2/2 months ›

Glossary & Metric Help

What every term means and how it's calculated.

A Glossary

Term Meaning Unit Where used
OEE — Overall Equipment Effectiveness How effectively a machine runs vs ideal.
A × P × Q
% All OEE views
A — Availability Share of planned time the machine was actually running.
Run Time ÷ Planned Production Time
% Machine card
P — Performance Actual speed vs ideal speed.
Total ÷ ((Run Time ÷ 60) × Ideal rate)
% Machine card
Q — Quality Share of output that was good.
Good ÷ Total
% Machine card
Att. — Attainment Actual output vs planned / target.
Actual ÷ Planned
% Machine / Plant
DT — Downtime Minutes stopped during planned time. minutes Losses
units — Output Total quantity produced. pcs / kg / ltr Everywhere
PPT — Planned Production Time Shift length minus planned stops.
Shift length − Planned stops
minutes Availability
Run Time Time the machine was actually running.
PPT − Downtime
minutes Availability
Good Good output, excluding rejects.
Total − Reject
pcs / kg Quality
Ideal rate Standard output per hour. units/hr Performance
Reject % Share of output rejected.
Reject ÷ Total
% All views
Runner % Runner produce vs total produce.
Runner ÷ Total
kg / % Moulding & PTMT
Lumps Start-up / purge waste. kg PTMT
Utilisation Actual hours vs ideal hours.
Actual hours ÷ Ideal hours
% Machine / Mould
Output efficiency Actual vs ideal output (or run-hours).
Actual output ÷ Ideal output
% Reports
Mould age-in-efficiency Efficiency % tracked against mould age. % Mould reports
Weight-loss % Material lost in processing.
(Material in − Material out) ÷ Material in
% Compound
Labour cost Wages per kg of output, or per paid hour.
Wages ÷ Output (kg) · Wages ÷ Paid hours
₹/kg · ₹/hr Cost reports
Power cost Electricity cost for the period (total or per unit). ₹ · ₹/unit Cost reports
Solar cost Solar power cost / credit for the period. Cost reports
Ideal / Actual hours Ideal hrs = planned run hours. Actual hrs = hours actually run. hours Utilisation reports
FY — Financial Year Apr–Mar. YoY = year-on-year vs prior FY. Period selector
Plant / Unit · Segment Plant = KH, VN, WB (or Unit-1/2/3). Segment = CP, PTMT, Sink, Hinges, Pipe & Fitting, Garden, HDPE, Tank. Filters
M/C · Mould M/C = machine. Mould = tool with cavity / cycle / pc-weight. Reports
Machine code Type-plant+number, e.g. TK-VN1 = Tank line, VN plant, machine 1. Machine

B Formulas

PPT = Shift length − Planned stops
Run Time = PPT − Downtime
Good = Total − Reject
A = Run Time ÷ PPT
P = Total ÷ ((Run Time ÷ 60) × Ideal rate)
Q = Good ÷ Total
OEE = A × P × Q
Att. = Actual output ÷ Planned output
Reject % = Reject ÷ Total
Runner % = Runner ÷ Total
Utilisation = Actual hours ÷ Ideal hours
Output efficiency = Actual output ÷ Ideal output
Avg output/hour = Output ÷ Run hours
Weight-loss % = (Material in − Material out) ÷ Material in
Labour cost/kg = Wages ÷ Output (kg)
Labour cost/hour = Wages ÷ Paid hours
Worked example
TK-VN1: A 87.6% × P 88.2% × Q 97.0% = OEE 74.8%
All numbers are computed by deterministic code, never by the AI.

C OEE rating bands

World-class OEE ≥ 85%
Good 60% – 85%
Needs action OEE < 60%
The same colours apply to Attainment and other rated metrics.