Last updated: 12-06-2026 → true daily data for PTMT. Any plant not listed had no run recorded on these days.
20 flag(s)
8/10 files · 48/55 machines · 2/2 months ›
Export PDF
⚠ Reconciliation issue — 1 flag(s)
Management Commentary
AI prose · computed numbers
Segment-wise cost data for the period shows a utilisation rate of 28.9%, which serves as the headline metric and indicates that available capacity is being significantly underutilised across the reported segments. A total of 5,483.54 good units were produced with zero rejections or runner losses, reflecting strong quality discipline, though the absence of OEE and efficiency data limits a fuller assessment of operational performance. Management should investigate the drivers behind the low utilisation figure, as bringing this closer to benchmark levels represents the primary lever for improving cost efficiency across segments.
Util.
28.9%
Output
5,484
Reject %
0.0%
Util.
28.9%
Runner %
0.0%
Attain.
0.0%
Monthly source — Output Efficiency & Utilisation shown. True OEE (with A/P/Q) needs daily shift logs.
Labour Cost (₹)
Detailed Data
| Segment | Output | Labour Cost | Power Cost | Solar Cost | Labour/unit | Power/unit |
|---|---|---|---|---|---|---|
| PTMT – Blow Moulding | 249 | ₹0 | ₹0 | ₹0 | ₹0.00 | ₹0.00 |
| PTMT – Corrugator | 395 | ₹0 | ₹0 | ₹0 | ₹0.00 | ₹0.00 |
| PTMT – Grinding | 1,375 | ₹0 | ₹0 | ₹0 | ₹0.00 | ₹0.00 |
| PTMT – Injection (N-line) | 2,123 | ₹0 | ₹0 | ₹0 | ₹0.00 | ₹0.00 |
| PTMT – Injection (standard) | 2,716 | ₹0 | ₹0 | ₹0 | ₹0.00 | ₹0.00 |
Validation Flags
⚠
RECONCILE FAIL — computed output 5483.54 ≠ row sum 6858.54