Last updated: 15-06-2026 → true daily data for PTMT. Any plant not listed had no run recorded on these days.
13 flag(s) 8/10 files · 48/55 machines · 2/2 months ›

Mould-wise Summary

Last updated: 15-06-2026
Export PDF
⚠ Reconciliation issue — 1 flag(s)
Management Commentary AI prose · computed numbers

Across 51 moulds reviewed in this summary, the operation recorded a utilisation rate of 36.2%, meaning machines were actively running for only around 45,180 minutes out of a potential 124,885 minutes of shift time, which points to significant idle or unaccounted capacity that warrants investigation. On a positive note, all 4,937 units produced were accepted as good output, with zero rejections and no runner or lump waste recorded, indicating strong process quality when machines are running. However, OEE, availability, performance, and attainment metrics are unavailable or zero, suggesting gaps in data capture around planned outputs and downtime logging that should be addressed to enable a complete picture of mould-level efficiency.

Util.
36.2%
Output
4,937
Reject %
0.0%
Util.
36.2%
Runner %
0.0%
Attain.
0.0%
Monthly source — Output Efficiency & Utilisation shown. True OEE (with A/P/Q) needs daily shift logs.

Output

No data for this period / filter combination

Validation Flags

RECONCILE FAIL — computed output 4937.07 ≠ row sum 6362.07