Across the Compound and Material Compilation report covering 50 recorded entries, the facility achieved a utilisation rate of 28.9%, which serves as the headline metric for this period and indicates that productive run time represents less than a third of the total available shift time of 149,500 minutes. A total of 5,483.54 units were produced with zero rejects, reflecting perfect quality on the output that was generated, though the absence of OEE and efficiency data limits a fuller assessment of overall equipment and operational performance. The low utilisation figure warrants management attention, as it suggests significant idle or unaccounted capacity, and a review of scheduling, material availability, and planned activity logging would help clarify whether this reflects a structural underutilisation or a gap in data capture.
Output
Detailed Data
| Compound | Total Output | Total Reject | Weight Loss % |
|---|---|---|---|
| Other | 5,484 | 0 | 100.00% |